West 94 Area Transportation Plan

DRAFT DOCUMENT AVAILABLE FOR PUBLIC REVIEW

The draft plan document for the West 94 Area Transportation Plan is now available for public review and comment.  Please click on the link below to review the draft plan or plan appendices.  Public interested in providing comments can submit them by July 2nd.  Please submit comments to:

Dan Farnsworth, Metro COG Project Manager
farnsworth@fmmetrocog.org
or
One 2nd St N, Suite 232
Fargo, ND 58102

 

DRAFT DOCUMENT


APPENDICES (PUBLIC ENGAGEMENT) 


Public Input

Public input for the West 94 Area Transportation Plan was held from February 20th through March 9th, which included online engagement as well as a public open house.  The public open house was held on Thursday, February 27th at the Rustad Center in West Fargo.  The presentation shown at the open house can be viewed in the link below.

 

Results of the public input opportunity can be found in the draft document linked above.  


BACKGROUND AND OBJECTIVE

With construction of the FM Area Diversion Project, previously flood-prone land will become protected from flooding when the Diversion Project is complete in 2027.  Pending landowner interest, future utility extensions, and other factors, undeveloped land on the east side of the FM Diversion Project is anticipated to develop at a notable pace. 

The area of development being analyzed by this plan is roughly 2.5 square miles of land located southwest of I-94, north of 32nd Ave W, west of the Sheyenne Diversion, and east of 38th St W.  For the purposes of this plan, this area is being called the West 94 Area.

The objective of this plan is to develop future growth scenarios and outcomes, develop a future roadway network, and determine the necessary roadway connections needed to service this future growth area.  Roadway connections to the West 94 Area may include connections to existing neighborhoods, arterial roadways, and I-94.  Roadway connections will also consider bicycle and pedestrian connections. 

Upon completion of this plan, jurisdictions will have a framework for implementing the transportation connections necessary to accommodate the West 94 Area.

 

PROJECT TIMELINE

  • June 2024 - Plan Kickoff
  • July 2024 - March 2025 – Plan Development
  • October - December 2024 - Stakeholder & Landowner Outreach
  • February/March 2025 – Public Input
  • June 2025 - Draft Plan
  • August 2025 – Final plan adopted